Skip to content

A leading firmsince 2001

עבריתעב077-670-4444
4.9 · 55 real reviews on Google

Home inspection in a new apartment from a contractor: plaster defects

Written by the engineers of Arad Bedek Bayit, led by engineer Ron Arad

Buying an apartment or a house calls for a comprehensive inspection before the purchase, even when the apartment is brand new from the contractor. If anything, a new-build apartment deserves an even more rigorous check of everything relating to the home and its surroundings, for two main reasons.

First, our natural instinct is to assume that a completely new building will be flawless, which tempts us to think we can skip the inspection (home inspection, or bedek bayit) altogether. In reality, plenty of buildings are not built properly: the infrastructure is shaky, the foundations are unstable, the plaster falls short of even minimal standards, and negligence is common.

A construction-defects inspection by a home inspection engineer is what surfaces these problems before it's too late, and lets you, the resident, get them fixed under warranty.

Second, it is important to have the new apartment inspected before you complete the purchase. Apartments sold by a contractor carry a warranty for a limited period, during which any needed repair is at the contractor's expense. Inspecting the apartment and catching construction defects in time can save you a great deal of money, provided it happens while the contractor's warranty is still in force.

Checking plaster as part of a home inspection

Plaster is one of the things a home inspection pays close attention to. The inspection is a comprehensive process that scans every relevant parameter at both the micro and macro level of the structure, and plaster gets checked thoroughly as part of that.

The engineer examines everything relevant to the soundness of the structure and its infrastructure, then submits findings that stand as a legitimate, legal record. That summary document is a legal document in every sense, and on its basis the new owner can demand every necessary repair and improvement.

Plaster is one of the most common problem areas in any house, and surprisingly, even brand-new houses are not exempt. The cuts between different trades must be perfectly even. The joints where walls meet the ceiling must be straight. Wavy plaster is not up to standard, whether around outlets, switches, or the electrical panel cover, and where it appears, the contractor is obligated to make the correction.

While checking for plaster problems, the engineer also looks for cracks in the inner plaster layers, even in a fully new apartment. How a crack is repaired matters as much as whether it is repaired: it has to be opened up, deepened, and properly filled so it does not come back, all while keeping the finish uniform.

As an illustration, here is an exterior plaster defect found in a house in Zichron Yaakov:

In more serious cases, the problem lies in the scratch coat, the first layer applied directly to the exposed block or concrete wall, whose job is to bond the wall to the main plaster layer (the black leveling coat).

When the scratch coat is not applied properly, the plaster detaches from the wall. The tell-tale signs are a hollow sound when you tap the plaster, certain kinds of cracks, and in severe cases, pieces of plaster coming loose altogether.

The engineers of Arad Bedek Bayit, led by building engineer Ron Arad, whom courts appoint as their own expert on construction defects. The company has been inspecting apartments and buildings since 2001. Engineer Ron Arad · More about the company

Real reviews on Google

4.9 out of 5 · 55 reviews

  • Arad Bedek Bayit prepared an engineering expert opinion to our satisfaction and brought about success in our lawsuit against the contractor… Warmly recommended

    Sharon Elkayam · a claim against a contractor

  • Professional, thorough, and excellent service throughout the process. A must for every apartment buyer. Highly recommended

    Ef Ya · buying an apartment

  • …Contractors regard Arad's reports as reliable, so it is relatively very easy to deal with them when it comes to getting the defects handled. Highly recommended

    Shalom Maoz · building committee and private client

  • …He found several flaws I had not noticed and, most important, moisture in a kitchen cabinet caused by a poorly sealed water pipe…

    Yonatan Y · new apartment

  • After a thorough survey, and after going through sample reports from several inspection companies, I chose Arad Bedek Bayit…

    Orit Horowitz · compared reports

  • …Thanks to them we made several essential repairs in the apartment we bought, things we had not seen and did not know about…

    Reut Azriel-Ifergan · dampness and resale

  • The engineer arrived on time, checked the apartment down to the smallest detail and came across as very thorough… much more than just a report.

    Arnon Meiri · building inspection

  • …The real solution to dampness and mold problems is found only with engineers who examine things in depth, professionally and objectively.

    Y. Bril · dampness and mold

  • Arad carried out a comprehensive inspection of the apartment for us before we bought it. The engineer was very courteous and professional, explained everything…

    Michal Torky · before buying

More on this topic