More failure points behind construction and underground waterproofing defects

1. Inspection and oversight

Waterproofing is hard to inspect or monitor unless the supervisor has broad, hands-on experience. In most cases, only the result tells the truth, and by the time water penetration becomes visible, it's too late: the repairs are already difficult and expensive.

2. The warranty period

Once a project wraps up, the professionals move on. If water gets in, the waterproofing contractor gets the call.
Under the Sale (Apartments) Law, contractors must repair construction defects during both the inspection period and the warranty period.

For waterproofing and dampness problems from any source (walls, roof, shelter), that means three years of inspection period (tkufat bedek), plus three more years of warranty period on top of it. A strong, responsible contractor will carry out the repairs properly, as the law requires.

But sometimes the damage from a leak, let alone the waterproofing fix itself, is so expensive that a weak contractor simply can't afford to do it right, and temporary patches begin instead, aimed only at pushing the problem into next year and hoping it holds.

3. Cutting corners on the developer's end

One of the most painful causes of failure is saving money on exactly the thing you should spend on: a proper waterproofing consultant and sound planning.
Getting both right sometimes means costs that are high and hard to predict up front.

Developers sometimes pressure their waterproofing consultant into cheaper details, which often leads straight to serious construction and waterproofing defects. Other times they simply pick a cheaper consultant, and cheap, as the saying goes, often turns out expensive.

Back to the question we opened with

So how did Noah really manage such a massive waterproofing job, in such stormy seas, for so long? Here are a few answers, and everyone can pick the one that feels right to them:
1. Divine help. In truth, it would not have been possible without the Creator's help.

No one could have pulled off waterproofing on that scale with the means available to Noah.
2. Noah had all the time and materials he needed to do the job properly, without worrying about time or money, which today are a central constraint on every project.

3. Noah knew that he, his family and every survivor of the flood would depend on the ark for a long time under the harshest conditions, and that pushed him to make it work.

The engineers of Arad Bedek Bayit, led by building engineer Ron Arad, whom courts appoint as their own expert on construction defects. The company has been inspecting apartments and buildings since 2001. Engineer Ron Arad · More about the company

Real reviews on Google

4.9 out of 5 · 55 reviews

  • Arad Bedek Bayit prepared an engineering expert opinion to our satisfaction and brought about success in our lawsuit against the contractor… Warmly recommended

    Sharon Elkayam · a claim against a contractor

  • Professional, thorough, and excellent service throughout the process. A must for every apartment buyer. Highly recommended

    Ef Ya · buying an apartment

  • …Contractors regard Arad's reports as reliable, so it is relatively very easy to deal with them when it comes to getting the defects handled. Highly recommended

    Shalom Maoz · building committee and private client

  • …He found several flaws I had not noticed and, most important, moisture in a kitchen cabinet caused by a poorly sealed water pipe…

    Yonatan Y · new apartment

  • After a thorough survey, and after going through sample reports from several inspection companies, I chose Arad Bedek Bayit…

    Orit Horowitz · compared reports

  • …Thanks to them we made several essential repairs in the apartment we bought, things we had not seen and did not know about…

    Reut Azriel-Ifergan · dampness and resale

  • The engineer arrived on time, checked the apartment down to the smallest detail and came across as very thorough… much more than just a report.

    Arnon Meiri · building inspection

  • …The real solution to dampness and mold problems is found only with engineers who examine things in depth, professionally and objectively.

    Y. Bril · dampness and mold

  • Arad carried out a comprehensive inspection of the apartment for us before we bought it. The engineer was very courteous and professional, explained everything…

    Michal Torky · before buying

More on this topic