An apartment in Mazkeret Batya where various defects were discovered during the inspection period. Mainly:
1. Condensation problems due to faulty thermal insulation.
2. Dampness problems.
Result: Klachevsky won against Afikei Al-Ron Yizum Projects Ltd., thanks to Arad's expert opinion:
83,780 ₪
To view the Klachevsky vs. Afikei Al-Ron Yizum Projects Ltd. ruling, October 2013
The engineers of Arad Bedek Bayit, led by building engineer Ron Arad, whom courts appoint as their own expert on construction defects. The company has been inspecting apartments and buildings since 2001. Engineer Ron Arad · More about the company