Skip to content

A leading firmsince 2001

עבריתעב077-670-4444
4.9 · 55 real reviews on Google

Shower floor slope: what the standard requires

Written by the engineers of Arad Bedek Bayit, led by engineer Ron AradUpdated: June 2024

A digital level placed next to the shower drain
Photographed during an Arad inspection
On this page · 3
  1. What slope should a shower floor have?
  2. The standard: at least 1% toward the drain
  3. What to do if the shower floor does not slope enough

What slope should a shower floor have?

Have you ever checked the slope of your shower floor? Does the water drain well enough?
What does the standard require?
When you install a new shower stall, or move into a new apartment from a contractor,

it is worth checking that the floor really slopes toward the drain as the standard requires.
A faulty slope is a construction defect. It leaves standing water, which is a sanitary hazard: bacteria and fungi, mosquitoes and so on.
In some cases the water also seeps through to the neighbors.

The standard: at least 1% toward the drain

The shower floor must slope at least 1% toward the drain. That is the standard, and anything less than one percent counts as a construction defect. You can measure it yourself with a level, or order a building inspection expert who will check the full range of construction defects in the home (the shower slope is just one small item among hundreds of elements that may be faulty).

What to do if the shower floor does not slope enough

The law requires the contractor to take the shower apart and rebuild it, as part of the inspection period (tkufat bedek) of a new apartment.
Estimated cost of this kind of work: ₪1,500.

The engineers of Arad Bedek Bayit, led by building engineer Ron Arad, whom courts appoint as their own expert on construction defects. The company has been inspecting apartments and buildings since 2001. Engineer Ron Arad · More about the company

Real reviews on Google

4.9 out of 5 · 55 reviews

  • Arad Bedek Bayit prepared an engineering expert opinion to our satisfaction and brought about success in our lawsuit against the contractor… Warmly recommended

    Sharon Elkayam · a claim against a contractor

  • Professional, thorough, and excellent service throughout the process. A must for every apartment buyer. Highly recommended

    Ef Ya · buying an apartment

  • …Contractors regard Arad's reports as reliable, so it is relatively very easy to deal with them when it comes to getting the defects handled. Highly recommended

    Shalom Maoz · building committee and private client

  • …He found several flaws I had not noticed and, most important, moisture in a kitchen cabinet caused by a poorly sealed water pipe…

    Yonatan Y · new apartment

  • After a thorough survey, and after going through sample reports from several inspection companies, I chose Arad Bedek Bayit…

    Orit Horowitz · compared reports

  • …Thanks to them we made several essential repairs in the apartment we bought, things we had not seen and did not know about…

    Reut Azriel-Ifergan · dampness and resale

  • The engineer arrived on time, checked the apartment down to the smallest detail and came across as very thorough… much more than just a report.

    Arnon Meiri · building inspection

  • …The real solution to dampness and mold problems is found only with engineers who examine things in depth, professionally and objectively.

    Y. Bril · dampness and mold

  • Arad carried out a comprehensive inspection of the apartment for us before we bought it. The engineer was very courteous and professional, explained everything…

    Michal Torky · before buying

More on this topic