A solar water heater that isn't heating properly

Written by the engineers of Arad Bedek Bayit, led by engineer Ron Arad

A sunny winter day ends in a cool evening, and when you go to shower, the hot water runs out far sooner than it should?

Solar water heater hidden by a stairwell shaft
Solar collectors hidden by a stairwell shaft

In a new building from a contractor, problems with the solar system are a fairly common construction defect. Poor planning of the collector area means some of the solar collectors simply do not do their job.

The standard allows a solar collector to be shaded for up to 10% of its area, so at least 90% must be exposed to the sun. In this building, for example, the collectors on the right side are clearly and completely blocked by the stairwell shaft to their south.

Where and how the collectors were positioned violates Standard 579 (Part 5, section 4.2.2, on solar systems), which references Part 4 of the standard: "the collectors shall be positioned so that no frontal or side shade whatsoever is cast on them" and "the maximum shading area on a solar collector shall be less than 10%."

In many buildings, a home inspection engineer finds even larger portions of the collectors hidden, in which case the contractor must relocate them or compensate the residents financially. Solar-system problems in new buildings are not limited to hidden collectors either: connections in the closed solar system can also leak, causing a drop in water pressure. Either way, it is worth having a building inspection done on the apartment and the common areas.

The engineers of Arad Bedek Bayit, led by building engineer Ron Arad, whom courts appoint as their own expert on construction defects. The company has been inspecting apartments and buildings since 2001. Engineer Ron Arad · More about the company

Real reviews on Google

4.9 out of 5 · 55 reviews

  • Arad Bedek Bayit prepared an engineering expert opinion to our satisfaction and brought about success in our lawsuit against the contractor… Warmly recommended

    Sharon Elkayam · a claim against a contractor

  • Professional, thorough, and excellent service throughout the process. A must for every apartment buyer. Highly recommended

    Ef Ya · buying an apartment

  • …Contractors regard Arad's reports as reliable, so it is relatively very easy to deal with them when it comes to getting the defects handled. Highly recommended

    Shalom Maoz · building committee and private client

  • …He found several flaws I had not noticed and, most important, moisture in a kitchen cabinet caused by a poorly sealed water pipe…

    Yonatan Y · new apartment

  • After a thorough survey, and after going through sample reports from several inspection companies, I chose Arad Bedek Bayit…

    Orit Horowitz · compared reports

  • …Thanks to them we made several essential repairs in the apartment we bought, things we had not seen and did not know about…

    Reut Azriel-Ifergan · dampness and resale

  • The engineer arrived on time, checked the apartment down to the smallest detail and came across as very thorough… much more than just a report.

    Arnon Meiri · building inspection

  • …The real solution to dampness and mold problems is found only with engineers who examine things in depth, professionally and objectively.

    Y. Bril · dampness and mold

  • Arad carried out a comprehensive inspection of the apartment for us before we bought it. The engineer was very courteous and professional, explained everything…