Construction defects in roofs

Written by the engineers of Arad Bedek Bayit, led by engineer Ron Arad

On this page · 6
  1. Roof waterproofing
  2. Safety and maintenance on roofs
  3. Electricity on roofs
  4. Roof slopes
  5. Solar system
  6. Roof coping

A black pipe passing through the roof parapet, with damaged waterproofing around its base

What is important to check on the roof of a shared building? These are the main issues.

The flat roof of a residential building with sheet-metal ventilation ducts along the parapet

Roof waterproofing

The roof has to be completely watertight so that water does not get into the building, as required by the Israeli Standard and by the Planning and Building Regulations that bind the contractor. That requires correct waterproofing details made with the correct materials.

For example, this is what a proper waterproofing detail looks like where a pipe comes out of the roof (a "grandpa's cane" gooseneck, makel saba): the pipe is installed inside a bent sleeve that keeps water out.

Drawing of a waterproofing detail: a pipe coming out of the roof floor inside a bent sleeve, the grandpa's cane

In many cases, faulty waterproofing around a pipe on the roof, which is quick and simple to repair, causes serious dampness problems. Two such examples from buildings we inspected appear on the page Defects we found in buildings.

Safety and maintenance on roofs

No less important is safety and the ability to maintain the roof properly. For example: a standard, safe ladder to the upper roof, standard railings 1.05 meters high, and access routes between the installations on the roof (water heaters, the solar system, air-conditioner units and more).

We have come across several cases where a row of solar collectors was installed so that the part of the roof behind it could not be reached. More on railings and safety on the page Safety.

Electricity on roofs

Electricity and water do not mix, so the electrical system on the roof has to be safe and watertight. For example, electrical conduits have to be raised above the roof floor and led correctly into watertight boxes.

Roof slopes

The roof slopes have to be such that no puddles form on it. Puddles increase the risk of water getting into the building, and can also create a sanitary hazard (mosquitoes, odors). That is why a lightweight concrete fill (betkal) has to be laid for the slopes first, and only then are the bituminous membranes installed, so that a slope of 1.5% is created.

Solar system

Solar collectors on the roof, installed right up against a high parapet wall

You need to check whether the solar collectors are positioned to make the best use of the sun's energy, or whether there is shading of more than 10%, beyond what Standard 579 allows.

When there is shading like this, the efficiency of the system suffers. In that situation the collectors have to be reinstalled, raised, so that the shading does not exceed what the standard allows, and you need to check whether the collector output has to be increased according to the factor obtained at the new location.

Roof coping

The coping (the horizontal stone slabs installed on top of the roof parapet) has to be anchored to the parapet with a screw in every slab, with expansion joints as required by Israeli Standard 2378. Otherwise there is a real danger of stone slabs falling onto the balconies and into the building's yard.

The engineers of Arad Bedek Bayit, led by building engineer Ron Arad, whom courts appoint as their own expert on construction defects. The company has been inspecting apartments and buildings since 2001. Engineer Ron Arad · More about the company

Real reviews on Google

4.9 out of 5 · 55 reviews

  • Arad Bedek Bayit prepared an engineering expert opinion to our satisfaction and brought about success in our lawsuit against the contractor… Warmly recommended

    Sharon Elkayam · a claim against a contractor

  • Professional, thorough, and excellent service throughout the process. A must for every apartment buyer. Highly recommended

    Ef Ya · buying an apartment

  • …Contractors regard Arad's reports as reliable, so it is relatively very easy to deal with them when it comes to getting the defects handled. Highly recommended

    Shalom Maoz · building committee and private client

  • …He found several flaws I had not noticed and, most important, moisture in a kitchen cabinet caused by a poorly sealed water pipe…

    Yonatan Y · new apartment

  • After a thorough survey, and after going through sample reports from several inspection companies, I chose Arad Bedek Bayit…

    Orit Horowitz · compared reports

  • …Thanks to them we made several essential repairs in the apartment we bought, things we had not seen and did not know about…

    Reut Azriel-Ifergan · dampness and resale

  • The engineer arrived on time, checked the apartment down to the smallest detail and came across as very thorough… much more than just a report.

    Arnon Meiri · building inspection

  • …The real solution to dampness and mold problems is found only with engineers who examine things in depth, professionally and objectively.

    Y. Bril · dampness and mold

  • Arad carried out a comprehensive inspection of the apartment for us before we bought it. The engineer was very courteous and professional, explained everything…

    Michal Torky · before buying

More on this topic